Small-batch production
Plan a smaller production run
A focused collection or an initial order begins with a manageable production plan. Use this route to discuss a smaller run of selected garments, whether the styles are already defined or still need development.

Fabric cutting is one stage of garment making. A production plan connects the individual garment with the full assortment.
The assortment matters as much as the total
One style in a single colour creates a different production question from the same quantity spread across several styles and colours. The way a run is divided matters as much as its overall size.
This route focuses on that production plan. If the garment itself still needs to be developed, design and sampling also need a place in the discussion. Minimum quantities, pricing and timing are assessed around the proposed assortment.
- The garmentsProduct categories, references and whether specifications are ready or still in development.
- The assortmentStyles, colours, pieces per colour and size breakdown, with any sample requirements.
- The delivery planDelivery country, intended timing and whether this is an initial run or a repeat order.